Case Studies

Pond and Lagoon Survey

Sampling across the pond establishes stratification, solids loading and working volume before any plant is mobilised.

Skid Mounted Mobilisation

Plant is transported to site and set up without permanent works, so the pond can be worked where it lies.

Continuous Decanter Separation

A horizontal decanter parts oil, water and solids in one continuous operation while extraction continues.

Three Fraction Recovery

Recovered oil is purified for resale, water is treated to the site discharge limit and solids leave reduced in volume and mass.

Screening and Preparation

Oversize material and debris are taken out ahead of the wash stage so the circuit runs without obstruction.

Soil Washing

The wash stage releases hydrocarbon bound to the soil particles, which allows the mineral fraction to be recovered rather than disposed of.

Wash Water Recycle

Treated wash water returns to the wash stage, so fresh water demand is limited to make up rather than full throughput.

Verification Before Placement

Treated soil is checked against the remediation target before it is placed back.

Tank Isolation

The tank is taken out of service, drained and made safe for entry before any cleaning begins.

Sludge Fluidisation

Deposits are fluidised so they can be pumped out rather than dug out, which keeps the work continuous.

Treatment On Site

Sludge is separated into oil, water and solids as it comes, shortening the period the tank stays out of service.

Inspection and Handover

Internals are cleaned to the standard required for statutory inspection and recovered oil is returned.